2022 … 2023 Pegau – Remodeling on 3 Pressure precoat filters
Construction of 3 Piece of pressure precoat filter as a tubular precoat filter with a total of 660m³/h in the Pegau public pool.
Construction of 3 Piece of pressure precoat filter as a tubular precoat filter with a total of 660m³/h in the Pegau public pool.
For the mission, it was therefore necessary to equip the filter with new filter plates, to develop these plates new and economically for a first single piece. The 21 existing panels were against 43 to add new plates to be developed.
The Kükelhaus School in Magdeburg, the building was 2009 built. For the children and young people a pool was designed with height-adjustable floor. As a base, a concrete construction should serve, which are lined in the system "Myrthapools" and with a height movable floor (Hubboden) should be equipped.
Saransk is the capital of the Russian republic of Mordovia. Already 2010 the city has begun, to invest in infrastructure. Right next to the Ice Palace and the Sports Stadium, the palace of water sports was built. After the date of the opening was postponed due to delays in the other trades, was planned for December 2011 the completion of the bridge over the competition pool with a width of 25 meters. The pool itself is built with a length of approximately 51,50m, so that the end position of the bridge results in a pool length of 50,20m. With a displacement of the bridge to 25 Meter gets you 2 separate pools with a length of 25 Meter. These pools can be used differently in training and competition.
Saransk is the capital of the Russian republic of Mordovia. Already 2010 the city has begun, to invest in infrastructure. Right next to the Ice Palace and the Sports Stadium, the palace of water sports was built. During the construction phase it became clear, that it would be difficult, meet the opening date. Because the inauguration of Russian President should be made, absolute deadline loyalty was required of all trades. My job was it, to guide the Russian technicians and to secure the appointment.
The village Kaprun, in the middle of the Austrian Alps 2010 expanded its tourism offer by the hotel thermal spa "Tauern SPA". The terrain, on which the Hotel Therme was built, is called alluvial. The structural engineer had to take this into consideration and has decided to, to let build the pools only at a time, when the largest forces already rests on the foundations. He has therefore chosen a variable and possibly weather-independent construction for the pools. The very precise requirements of architects have been implemented through a redesign of the overflow gutter and of the hydraulic connections. The stone-covered gutter saves energy, especially in the mountains.
The outdoor pool Meinerzhagen is located within view of the A45 Autobahn and had to struggle with the consequences. The abrasion of the tires sat down every year on the slide the pool wall. In a previous step, the water treatment had been converted to Vacuum Precoat Filtration. The dimensioning of the circulating flow done for cost reasons and because of the good filling water quality on 50% compared to DIN 19643. This places special demands on the hydraulics of the pool. The pool in the old state had a deep overflow channel and below the floor level slopped walls. Unfortunately, the old overflow reservoir had been dimensioned a bit too small – or the overflow channel and the gradient tubes too large. Therefore, this system had to be changed with a smaller channel and replaced with pipelines in the right slope.
The district town Reichenbach im Vogtland has modernized the old outdoor pool group. It created a diving pool, a competition pool, an adventure pool and a children's pool. In the original planning was several pools of stainless steel, however, the price was able to convince the representatives of the city and the architect with my Italian client's system. To ensure that all services contract could be offered, various new developments and motivation of internal staff were required.
The first major challenge was an architect competition. Since we had drawn the pools already at the time of new 3D CAD technology, probably has the photomontage of the pool in an aerial view picture brought success . It was the first object, that under … Read More
The leisure and adventure pool "Sumpfmühle" Hetzdorf was built on the site of a dammed mill pond. Before the upper part of the lake was dammed. This part was used as a drinking water reservoir and the stream fed into a tube passing the object. So the pools are on a swampy basement. Originally, a part of the object should become reconsidered later and can be used throughout the year. From this design out the divided form of water areas due. The directly adjoining hotel "Sumpfmühle" and the object itself live in symbiosis.