On the (Pool-) border looked, New edition 06/2026

If we let it flow! Is there a reason, think about this little "surge water piping"? No later than, if you can convert these ideas into cash. Because of the surge of water transport in an overflow channel and a slope line is pure waste of money. For simplicity, we assume the basin from the last post and expect times with these values.

Who can not calculate, takes Tichelmann*!

The system of the pool hydraulic Tichelmann is widespread and can often be used without special calculations. But what, if thepool is not rectangular or relative 1:2 was built or even designed with curves in the pool wall from architects? In the article, the newspaper of the Federal Association of German Schwimmmeister “Das Schwimmbad und sein Personal” edition 02/2019 a note is given to the methods of calculation.

1 2 3
error: Content is protected !!