2020 … 2021 Herscheid – Doubling of the volume flow at the vacuum precoat filter

The Kükelhaus School in Magdeburg, the building was 2009 built. For the children and young people a pool was designed with height-adjustable floor. As a base, a concrete construction should serve, which are lined in the system "Myrthapools" and with a height movable floor (Hubboden) should be equipped.

Who can not calculate, takes Tichelmann*!

The system of the pool hydraulic Tichelmann is widespread and can often be used without special calculations. But what, if thepool is not rectangular or relative 1:2 was built or even designed with curves in the pool wall from architects? In the article, the newspaper of the Federal Association of German Schwimmmeister “Das Schwimmbad und sein Personal” edition 02/2019 a note is given to the methods of calculation.

2011 … 2012 Kükelhaus-school pool with hydraulic movable floor

The Kükelhaus School in Magdeburg, the building was 2009 built. For the children and young people a pool was designed with height-adjustable floor. As a base, a concrete construction should serve, which are lined in the system "Myrthapools" and with a height movable floor (Hubboden) should be equipped.

2011 Movable bridge over the competition pool in Saransk

Saransk is the capital of the Russian republic of Mordovia. Already 2010 the city has begun, to invest in infrastructure. Right next to the Ice Palace and the Sports Stadium, the palace of water sports was built. After the date of the opening was postponed due to delays in the other trades, was planned for December 2011 the completion of the bridge over the competition pool with a width of 25 meters. The pool itself is built with a length of approximately 51,50m, so that the end position of the bridge results in a pool length of 50,20m. With a displacement of the bridge to 25 Meter gets you 2 separate pools with a length of 25 Meter. These pools can be used differently in training and competition.

2011 Palace of water sports in Saransk, Troubleshooter for 30 days

Saransk is the capital of the Russian republic of Mordovia. Already 2010 the city has begun, to invest in infrastructure. Right next to the Ice Palace and the Sports Stadium, the palace of water sports was built. During the construction phase it became clear, that it would be difficult, meet the opening date. Because the inauguration of Russian President should be made, absolute deadline loyalty was required of all trades. My job was it, to guide the Russian technicians and to secure the appointment.

2009 … 2010 Hydraulic design and construction management of outdoor pools Tauern SPA

The village Kaprun, in the middle of the Austrian Alps 2010 expanded its tourism offer by the hotel thermal spa "Tauern SPA". The terrain, on which the Hotel Therme was built, is called alluvial. The structural engineer had to take this into consideration and has decided to, to let build the pools only at a time, when the largest forces already rests on the foundations. He has therefore chosen a variable and possibly weather-independent construction for the pools. The very precise requirements of architects have been implemented through a redesign of the overflow gutter and of the hydraulic connections. The stone-covered gutter saves energy, especially in the mountains.