2020 … 2021 Herscheid – Doubling of the volume flow at the vacuum precoat filter

The Kükelhaus School in Magdeburg, the building was 2009 built. For the children and young people a pool was designed with height-adjustable floor. As a base, a concrete construction should serve, which are lined in the system "Myrthapools" and with a height movable floor (Hubboden) should be equipped.

2019 … 2021 Development of a 6-channel ISE transmitter for the Humboldt University in Berlin

The Kükelhaus School in Magdeburg, the building was 2009 built. For the children and young people a pool was designed with height-adjustable floor. As a base, a concrete construction should serve, which are lined in the system "Myrthapools" and with a height movable floor (Hubboden) should be equipped.

On the (Pool-) border looked

If we let it flow! Is there a reason, think about this little "surge water piping"? No later than, if you can convert these ideas into cash. Because of the surge of water transport in an overflow channel and a slope line is pure waste of money. For simplicity, we assume the basin from the last post and expect times with these values.

The miller his pool

It was once a miller, was poor, but he had a large outdoor swimming pool. Now it happened, that he came to speak to the King, and to make himself appear, he said to him,: “I have a pool, the sun and water can spin into gold.” The king said to the miller: “This is an art, pleases me well, if your planning office is so clever, as you say, so bring it tomorrow in my castle, I will put her to the test.”

The lazy river and its pitfalls!

The adventure channel is a very commonly used in public attraction experience pools. The rotating water flow makes visitors much fun. A common mistake is, because of the rotation, to have to limit the pool with a wall. The assumption, that a particularly large amount of water would flow into the overflow channel in this area, will be refuted in the article. Published in the magazine 07/2018 the newspaper of the Federal Association of German Schwimmmeister "The swimming pool and its staff".

2011 … 2012 Kükelhaus-school pool with hydraulic movable floor

The Kükelhaus School in Magdeburg, the building was 2009 built. For the children and young people a pool was designed with height-adjustable floor. As a base, a concrete construction should serve, which are lined in the system "Myrthapools" and with a height movable floor (Hubboden) should be equipped.

2011 Movable bridge over the competition pool in Saransk

Saransk is the capital of the Russian republic of Mordovia. Already 2010 the city has begun, to invest in infrastructure. Right next to the Ice Palace and the Sports Stadium, the palace of water sports was built. After the date of the opening was postponed due to delays in the other trades, was planned for December 2011 the completion of the bridge over the competition pool with a width of 25 meters. The pool itself is built with a length of approximately 51,50m, so that the end position of the bridge results in a pool length of 50,20m. With a displacement of the bridge to 25 Meter gets you 2 separate pools with a length of 25 Meter. These pools can be used differently in training and competition.

2011 Palace of water sports in Saransk, Troubleshooter for 30 days

Saransk is the capital of the Russian republic of Mordovia. Already 2010 the city has begun, to invest in infrastructure. Right next to the Ice Palace and the Sports Stadium, the palace of water sports was built. During the construction phase it became clear, that it would be difficult, meet the opening date. Because the inauguration of Russian President should be made, absolute deadline loyalty was required of all trades. My job was it, to guide the Russian technicians and to secure the appointment.

1 2
error: Content is protected !!