DeutschEnglishРусский

 

If it should or have to go beyond the purely advisory, then can aqua&pools take over the overall planning contract. In this case, it remains possible, to integrate the localnear and familiar architect as sub-planner in the order and take advantage of its knowledge of local conditions. The most important part of planning is the full and complete preparation. For example, if an architect has drawn up a beautiful design, then the suitability of the material, the feasibility and compliance costs have to be checked. Everything before the real planning starts.

The planning itself can very well to the German Regulation of fees for architect- and engineering services (royalty rules for architects and engineers – "HOAI") orientate. What service phase will be contractually bound, is irrelevant. The gradual extension of the contract is conceivable too. The prefix advice, which almost every building owner needs, is not separately in the HOAI considered. These phases of planning following HOAI form as follows in 9 sections.

  1. Basic evaluation
  2. Preliminary planning
  3. Draft design
  4. approval planning
  5. Detailed design
  6. Preparation of tender and allocation
  7. Assisting allocation and contracting
  8. Site management
  9. property management

You are interested in these services or any part thereof? Then take now Contact to.